-
INTEGRATED COMMUNICATION SCHEDULING SCHEME FOR WIND POWER GENERATION
With the implementation of national wind power industry policies and the development of wind power technology, China's installed wind power capacity has become among the top in the world. With the deepening of wind power development, remote··· -
COMMUNICATION SCHEME FOR COAL MINE INTEGRATED SCHEDULING
The coal mine scheduling communication system is an important component of coal mine safety production. The advanced production scheduling command system ensures fast and accurate information transmission through diverse means, ensuring coa··· -
METAL/NON-METAL ORE DUAL LOOP INTEGRATED SCHEDULING SCHEME
The national standard GB16423-2020 Safety Regulations for Metal and Non Metal Mines will be implemented from September 1, 2021. The communication and monitoring section 6.7.7 of the safety regulations clearly stipulates that wired dispatch ··· -
INTEGRATED COMMUNICATION SCHEDULING SOLUTION FOR THE CHEMICAL INDUSTRY
The chemical industry is a high investment and high-risk industry, characterized by multiple infrastructure and supporting equipment, flammable and explosive working environments, toxicity, strong corrosiveness, and continuous production. O··· -
PUBLIC SECURITY EMERGENCY TELEPHONE DISPATCH SYSTEM SCHEME
The equipment of the public security command and dispatch communication system scheme adopts the latest computer technology, digital program-controlled switching technology, digital dispatch technology, digital communication technology, dig···