Haining Guangyao Natural Gas Integrated Program Controlled Switch Project




        The No.1 and No.2 energy stations of the Haining Guangyao Natural Gas Distributed Energy Project in Zhejiang Province have opened and delivered the integrated program-controlled switch project!


        The project is located in the Economic Development Zone of Haining City. No.1 Energy Station: with a scale of 3 * 8MW natural gas turbine generator units, 3 * 15t/h waste heat boilers, and 3 * 25t/h gas boilers, as well as corresponding supporting fuel, thermal, electrical, thermal, chemical water, ventilation and air conditioning, water supply and drainage, fire protection, environment, security, information management, construction engineering, etc. No.2 Energy Station: with a scale of 2 * 8MW natural gas turbine generator units, 2 * 15t/h waste heat boilers, and 3 * 25t/h gas boilers, as well as corresponding supporting fuel, thermal, electrical, thermal, chemical water, ventilation and air conditioning, water supply and drainage, fire protection, environment, security, information management, construction engineering, etc.






Shaanxi Coal Tongchuan Mining Multimedia Dispatch Machine System Renovation Project

 

Jizhong Energy Xingdong Coal Mine Integrated Communication Dispatch Machine Project

 
  • 云南省煤炭产业集团--云南田坝煤矿融合···

    随着云南田坝煤矿规模的扩大和新煤矿的投入使用,客户需要新增一套地面输出本安型程控···
    云南省煤炭产业集团--云南田坝煤矿融合通信调度项目
     
  • 岱山高亭至双峰新城公路项目(磨心山隧···

    岱山高亭至双峰新城公路工程全长5.124公里,其中磨心山隧道路线长度超过2.1公里,工程···
    岱山高亭至双峰新城公路项目(磨心山隧道)融合通信调度项目
     
  • 晋能控股装备制造集团供电公司电力融合···

    晋能控股装备制造集团有限公司供电公司成立于2007年,该供电公司的通信系统已经使用多···
    晋能控股装备制造集团供电公司电力融合调度通信项目