Shaanxi Coal Tongchuan Mining Multimedia Dispatch Machine System Renovation Project




        Shaanxi Shaanxi Coal Tongchuan Mining Co., Ltd. is a large state-owned coal enterprise under Shaanxi Coal and Chemical Industry Group Co., Ltd. Its predecessor was Tongchuan Mining Bureau established in 1955. Located in Tongchuan City, Shaanxi Province, it is adjacent to the ancient city of Xi'an to the south, the Mausoleum of the Yellow Emperor, the founder of human civilization, and the revolutionary holy land of Yan'an to the north. The railway and highway pass through the mining area, with rich cultural heritage and convenient transportation. The total assets of the company are 12.86 billion yuan, with two mining areas in Tongchuan and Jiaoping, eight mines, and reserves of 750 million tons. The annual approved production capacity is 11.6 million tons, with a coal mining mechanization rate of 100% and a comprehensive excavation mechanization rate of 80%. The first phase of the Xinsu PVC profile project, with a capacity of 50000 tons, has been completed. The company adheres to the concept of "development as the top priority, technology as the primary productive force, talent as the primary resource, harmony as the primary environment, and service as the primary responsibility", vigorously implements the strategy of revitalizing the enterprise through technology, strengthening the enterprise through talent, and promoting the enterprise through culture. The enterprise is full of vitality and vigor, and has built a solid platform for various talents to display their talents.


        The scheduling system used by Shaanxi Coal Tongchuan Mining in the past has been in use for some time, and the system is relatively outdated, unable to integrate and link with various existing systems. After multiple screenings in the market, Shaanxi Coal Tongchuan Mining selected the KTJ132 digital multimedia scheduling machine from Xiaoben Technology as its core scheduling equipment for integrated communication. The integrated function of the digital scheduling machine integrates the entire company's communication system. It has been delivered for use and has also received recognition from Shaanxi Coal Tongchuan Mining during its use.







Huadian Qiqihar Fularji 50MW Wind Power Project

 

Haining Guangyao Natural Gas Integrated Program Controlled Switch Project

 
  • 云南省煤炭产业集团--云南田坝煤矿融合···

    随着云南田坝煤矿规模的扩大和新煤矿的投入使用,客户需要新增一套地面输出本安型程控···
    云南省煤炭产业集团--云南田坝煤矿融合通信调度项目
     
  • 岱山高亭至双峰新城公路项目(磨心山隧···

    岱山高亭至双峰新城公路工程全长5.124公里,其中磨心山隧道路线长度超过2.1公里,工程···
    岱山高亭至双峰新城公路项目(磨心山隧道)融合通信调度项目
     
  • 晋能控股装备制造集团供电公司电力融合···

    晋能控股装备制造集团有限公司供电公司成立于2007年,该供电公司的通信系统已经使用多···
    晋能控股装备制造集团供电公司电力融合调度通信项目