Jizhong Energy Xingdong Coal Mine Integrated Communication Dispatch Machine Project




        Since its establishment, Jizhong Energy Xingdong Mine has conscientiously implemented the policies of the national and local governments and coal management departments, adhered to the principle of "safety first, prevention oriented", and implemented the strategy of "people-oriented, technology driven mining". At present, the mining technology of the mine has fully achieved comprehensive mechanization of mining. The "six major systems", power supply system, transportation system, ventilation system, gas drainage system and other major systems of the mine have been constructed according to standards. The mining integrated communication scheduling system used in this project seamlessly integrates multiple communication networks (IP PSTN、GSM、CDMA、WiFi、Wimax、 Simulate clusters, digital clusters, etc., and simultaneously achieve multi system scheduling such as voice scheduling, video scheduling, broadcast scheduling, cluster scheduling, alarm scheduling, SMS scheduling, contingency plan scheduling, GIS geographic information, etc.









Haining Guangyao Natural Gas Integrated Program Controlled Switch Project

 

Jiangbin Road Underpass Chengzhong Road Underground Tunnel Project in Jiangshan City, Zhejiang Province

 
  • 云南省煤炭产业集团--云南田坝煤矿融合···

    随着云南田坝煤矿规模的扩大和新煤矿的投入使用,客户需要新增一套地面输出本安型程控···
    云南省煤炭产业集团--云南田坝煤矿融合通信调度项目
     
  • 岱山高亭至双峰新城公路项目(磨心山隧···

    岱山高亭至双峰新城公路工程全长5.124公里,其中磨心山隧道路线长度超过2.1公里,工程···
    岱山高亭至双峰新城公路项目(磨心山隧道)融合通信调度项目
     
  • 晋能控股装备制造集团供电公司电力融合···

    晋能控股装备制造集团有限公司供电公司成立于2007年,该供电公司的通信系统已经使用多···
    晋能控股装备制造集团供电公司电力融合调度通信项目