Jiangxi Ji'an High speed Railway New City Pipe Gallery Project




        Overview of Ji'an Dongtang Avenue Pipe Gallery Project: The total length of the route is about 2773.08m (including 48m of Yudaihe Bridge), with a design speed of 50km/h and a road red line width of 40m; The pipe gallery project is located under the green belt south of Dongtang Avenue, with a length of approximately 2.79km. The cross-sectional form of the pipe gallery adopts a double compartment rectangle, with a net cross-sectional size (length * width) of 4.75mX2.9m; The entrance pipeline includes water supply, electricity, and communication.


        Overview of the Kubei West Road Road and Underground Comprehensive Pipe Gallery Project: The construction content of the Kubei West Road underground comprehensive pipe gallery is about 3100 meters long, with a standard cross-section of a double compartment rectangle (5.6 meters wide and 3.7 meters high). The pipeline entering the gallery includes water supply, power, communication, and natural gas pipelines, among which the natural gas pipeline is a separate compartment. The underground comprehensive pipe gallery is located outside the red line on the east side of the road, with a total investment of about 250 million yuan.








Hebei Tangshan Jingtang Port Corridor Command and Dispatch Machine Project

 

Mongolian Brokut Power Plant Integrated Communication Dispatch Project

 
  • 云南省煤炭产业集团--云南田坝煤矿融合···

    随着云南田坝煤矿规模的扩大和新煤矿的投入使用,客户需要新增一套地面输出本安型程控···
    云南省煤炭产业集团--云南田坝煤矿融合通信调度项目
     
  • 岱山高亭至双峰新城公路项目(磨心山隧···

    岱山高亭至双峰新城公路工程全长5.124公里,其中磨心山隧道路线长度超过2.1公里,工程···
    岱山高亭至双峰新城公路项目(磨心山隧道)融合通信调度项目
     
  • 晋能控股装备制造集团供电公司电力融合···

    晋能控股装备制造集团有限公司供电公司成立于2007年,该供电公司的通信系统已经使用多···
    晋能控股装备制造集团供电公司电力融合调度通信项目