Heilongjiang Jixi Didao Shenghe Coal Mine Integrated Communication Dispatch Machine Project




        The vertical shaft of Heilongjiang Didao Shenghe Coal Mine belongs to Heilongjiang Jixi Mining Group, which has a mining history of more than 60 years. The digital mining integration communication upgrade and transformation project is based on the core concept of "one network, one station+" in digital mining. It organically integrates multiple systems such as precise positioning, monitoring, communication, IP broadcasting, etc., to achieve unified access, unified carrying, and unified management of various systems in the mine.








Underground Comprehensive Pipe Gallery Project in Bowang District, Ma'anshan City, Anhui Province

 

Hebei Tangshan Jingtang Port Corridor Command and Dispatch Machine Project

 
  • 云南省煤炭产业集团--云南田坝煤矿融合···

    随着云南田坝煤矿规模的扩大和新煤矿的投入使用,客户需要新增一套地面输出本安型程控···
    云南省煤炭产业集团--云南田坝煤矿融合通信调度项目
     
  • 岱山高亭至双峰新城公路项目(磨心山隧···

    岱山高亭至双峰新城公路工程全长5.124公里,其中磨心山隧道路线长度超过2.1公里,工程···
    岱山高亭至双峰新城公路项目(磨心山隧道)融合通信调度项目
     
  • 晋能控股装备制造集团供电公司电力融合···

    晋能控股装备制造集团有限公司供电公司成立于2007年,该供电公司的通信系统已经使用多···
    晋能控股装备制造集团供电公司电力融合调度通信项目